Demo pelabur · Data simulasi · Fungsi produksi masih dalam pembangunan Senarai modul
OSYSRuang KerjaAU

Tiered Rate Configuration

Tempoh, ejen dan skim yang digunakan untuk pengiraan

TempohOgos 2026
EjenAiman Shah
SkimGrowth Accelerator v1.2

Eligible Margin Progress

RM45,000 daripada RM60,000 sasaran

RM45,00075%
Tier 1

RM0 — RM19,999

5%Rate
Tier 2

RM20,000 — RM39,999

7%Rate
ACTIVETier 3

RM40,000 — RM59,999

9%Rate
Tier 4

≥ RM60,000

12%Rate
Calculation Method

Progressive by band · setiap tier dikira berasingan

Alternative Method

Retroactive · kadar tertinggi kepada semua margin

Calculation Breakdown (Progressive by band)

Pengiraan setiap band secara deterministik

Margin BandRateEligible MarginCalculationAmount (RM)
RM0 — RM19,9995%RM20,000RM20,000 × 5%RM1,000.00
RM20,000 — RM39,9997%RM20,000RM20,000 × 7%RM1,400.00
RM40,000 — RM59,9999%RM5,000RM5,000 × 9%RM450.00
Total Eligible MarginRM45,000.00Gross CommissionRM2,850.00
Less: DeductionsRM0.00
Net Commission PayableRM2,850.00

Transaction Summary (Eligible Margin)

Rekod sumber yang menyumbang kepada tier semasa

Order DateOrder No. / InvoiceSourceDescriptionMargin (RM)Status
02 Ogo 2026SO-2026-0812Sales OrderProject Alpha — Phase 1RM15,000Eligible
07 Ogo 2026INV-2026-0821InvoiceAnnual Maintenance ContractRM10,000Eligible
13 Ogo 2026SO-2026-0830Sales OrderOffice Equipment UpgradeRM12,000Eligible
19 Ogo 2026INV-2026-0838InvoiceElectronics & Hardware SuppliesRM8,000Eligible
Total Eligible MarginRM45,000.00

Butiran Skim

Growth Accelerator v1.2

Versi Skimv1.2
Tempoh Berkuat Kuasa1 Jan 2026 — 31 Dis 2026
Kaedah PengiraanProgresif mengikut julat
NotaTertakluk kepada syarat Growth Accelerator v1.2

Status Tahap Semasa

Kelayakan berdasarkan margin semasa

Margin LayakRM45,000
Tahap SemasaTahap 3 (9%)
Tambahan untuk Tahap 4RM15,000

Anggaran Komisen pada Sasaran Penuh

Pengiraan progresif RM60,000

RM20,000 × 5%RM1,000.00
RM20,000 × 7%RM1,400.00
RM20,000 × 9%RM1,800.00
Jumlah Anggaran KomisenRM4,200.00
Semakan Struktur TahapSemua julat kadar bersambung dan struktur pengiraan adalah sah.
Menunggu KelulusanKadar bertingkat ini belum diluluskan dan masih boleh disemak.

Semua tindakan direkod untuk semakan.